RHINO 1594 Betreibershandbuch

Stöbern Sie online oder laden Sie Betreibershandbuch nach Rasenmäher RHINO 1594 herunter. RHINO 1594 Operator`s manual [en] [ja] Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 102
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
© 2011 Alamo Group Inc.
$0.00
1594
Published 01/11 Part No. F-4282C
OPERATOR’S MANUAL
RHINO
®
1020 S. Sangamon Ave.
Gibson City, IL 60936
800-446-5158
LOADER
This Operator's Manual is an integral part of the safe operation of this machine and must
be maintained with the unit at all times. READ,
UNDERSTAND, and FOLLOW the Safety
and Operation Instructions contained in this manual before operating the equipment. C01-
Cover
Seitenansicht 0
1 2 3 4 5 6 ... 101 102

Inhaltsverzeichnis

Seite 1 - OPERATOR’S MANUAL

© 2011 Alamo Group Inc.$0.001594Published 01/11 Part No. F-4282COPERATOR’S MANUAL RHINO® 1020 S. Sangamon Ave.Gibson City, IL 60936800-446-5158Email:

Seite 2 - To the Owner/Operator/Dealer

SAFETY1594 01/11 Safety Section 1-6© 2011 Alamo Group Inc.SAFETYEquipment Operation Safety Instructions and PracticesThis Implement may be wider tha

Seite 3 - TABLE OF CONTENTS

RHINO LIMITED WARRANTY1. LIMITED WARRANTIES1.01. Rhino warrants for one year from the purchase date to the original non-commercial, governmental, or

Seite 4

TO THE OWNER/OPERATOR/DEALERTo keep your implement running efficiently and safely, read your manual thoroughly and follow these directionsand the Saf

Seite 5 - SAFETY SECTION

1594 -SOM-01/11 P/N F-4282CPrinted U.S.A1594LOADER

Seite 6

SAFETY1594 01/11 Safety Section 1-7© 2011 Alamo Group Inc.SAFETYDO NOT operate this Implement on a Tractor that is not properly maintained. Should a

Seite 7

SAFETY1594 01/11 Safety Section 1-8© 2011 Alamo Group Inc.SAFETYDo not let the loader or attachment contact electrical power lines. Contactwith elec

Seite 8

SAFETY1594 01/11 Safety Section 1-9© 2011 Alamo Group Inc.SAFETYDo not use an attachment that is not securely attached to the quickhitch, The attach

Seite 9 - (SG-33)

SAFETY1594 01/11 Safety Section 1-10© 2011 Alamo Group Inc.SAFETYKnow before you DIG. Call 888-258-0808 and request that all buried utilities locati

Seite 10

SAFETY1594 01/11 Safety Section 1-11© 2011 Alamo Group Inc.SAFETYNever leave the Implement and Power Unit unattended while the Implement is in the r

Seite 11

SAFETY1594 01/11 Safety Section 1-12© 2011 Alamo Group Inc.SAFETYConnecting or Disconnecting Implement Safety Instructions and PracticesDo not stand

Seite 12

SAFETY1594 01/11 Safety Section 1-13© 2011 Alamo Group Inc.SAFETYTransporting Safety Instructions and PracticesTransport only at speeds where you ca

Seite 13

SAFETY1594 01/11 Safety Section 1-14© 2011 Alamo Group Inc.SAFETYMaintenance and Service Safety Instructions and PracticesLower the loader to the be

Seite 14

SAFETY1594 01/11 Safety Section 1-15© 2011 Alamo Group Inc.SAFETYNever work under the Implement, the framework, or any lifted componentunless the Im

Seite 15

To the Owner/Operator/DealerAll implements with moving parts are potentially hazardous. There is no substitute for a cautious, safe-mindedoperator wh

Seite 16 - Practices

SAFETY1594 01/11 Safety Section 1-16© 2011 Alamo Group Inc.SAFETYStorage and Parking Safety Instructions and PracticesConcluding Safety Instructions

Seite 17

SAFETY1594 01/11 Safety Section 1-17© 2011 Alamo Group Inc.SAFETYDecal LocationNOTE: Rhino supplies safety decals on this product to promote safe op

Seite 18

SAFETY1594 01/11 Safety Section 1-18© 2011 Alamo Group Inc.SAFETYITEM PART NO. QTY LEVEL DESCRIPTION1. D469 1 WARNING Loader Safety2. D468 2 DANGER

Seite 19

SAFETY1594 01/11 Safety Section 1-19© 2011 Alamo Group Inc.SAFETYDecal DescriptionLoader Safety-Read, understand and follow the operation, warning,a

Seite 20

SAFETY1594 01/11 Safety Section 1-20© 2011 Alamo Group Inc.SAFETYWARNING! - DO NOT operate with oil leaks. -Inspect hoses regularly. Failure to insp

Seite 21 - Decal Location

SAFETY1594 01/11 Safety Section 1-21© 2011 Alamo Group Inc.SAFETYRhino, LeftP/N 49696Rhino, RightP/N 51448Slow Moving Vehicle Decal. Keep SMV reflec

Seite 22

SAFETY1594 01/11 Safety Section 1-22© 2011 Alamo Group Inc.SAFETYWARNING! - Crushing Hazard. -To Avoid Serious Injury or DeathMake sure attachment i

Seite 23 - Decal Description

SAFETY1594 01/11 Safety Section 1-23© 2011 Alamo Group Inc.SAFETYFederal Laws and RegulationsThis section is intended to explain in broad terms the

Seite 25

Introduction Section 2-1INTRODUCTION SECTION

Seite 26 - P/N D516

TABLE OF CONTENTSSAFETY SECTION ... 1-1Gen

Seite 27 - Federal Laws and Regulations

INTRODUCTION1594 01/11 Introduction Section 2-2© 2011 Alamo Group Inc.INTRODUCTIONThe 1594 Loader is designed with care and built with quality mater

Seite 28

INTRODUCTION1594 01/11 Introduction Section 2-3© 2011 Alamo Group Inc.INTRODUCTIONDO NOT use drugs or alcohol immediately before or while operating

Seite 29 - INTRODUCTION SECTION

INTRODUCTION1594 01/11 Introduction Section 2-4© 2011 Alamo Group Inc.INTRODUCTIONThe RHINO 1594 Loader is designed for four-wheel drive tractors. T

Seite 30 - INTRODUCTION

INTRODUCTION1594 01/11 Introduction Section 2-5© 2011 Alamo Group Inc.INTRODUCTIONAttention Owner/OperatorBEFORE OPERATING THIS MACHINE:1. Carefully

Seite 32

Assembly Section 3-1ASSEMBLY SECTION

Seite 33

ASSEMBLY1594 01/11 Assembly Section 3-2© 2011 Alamo Group Inc.ASSEMBLYGeneral InformationMounting Kit can be installed using tools ordinarily availa

Seite 34

ASSEMBLY1594 01/11 Assembly Section 3-3© 2011 Alamo Group Inc.ASSEMBLYPreparing TractorShut off engine, engage brakes and remove key during installa

Seite 35 - ASSEMBLY SECTION

ASSEMBLY1594 01/11 Assembly Section 3-4© 2011 Alamo Group Inc.ASSEMBLYInstalling Left and Right Midmounting Brackets1. Unfasten valve mount from rig

Seite 36 - ASSEMBLY

ASSEMBLY1594 01/11 Assembly Section 3-5© 2011 Alamo Group Inc.ASSEMBLYPlumbing Loader1. Connect hoses to the adapter fittings, starting from the bot

Seite 37

Operating the Tractor and Loader ...

Seite 38

ASSEMBLY1594 01/11 Assembly Section 3-6© 2011 Alamo Group Inc.ASSEMBLYAttaching Bucket to LoaderTo avoid injury during installation of bucket, do no

Seite 39

ASSEMBLY1594 01/11 Assembly Section 3-7© 2011 Alamo Group Inc.ASSEMBLYConnecting Quick Attach Device (Optional)Attaching Quick Attach and Bucket to

Seite 40

ASSEMBLY1594 01/11 Assembly Section 3-8© 2011 Alamo Group Inc.ASSEMBLY• Examine the fit between the quick hitch and thebottom of the attachment brac

Seite 41

ASSEMBLY1594 01/11 Assembly Section 3-9© 2011 Alamo Group Inc.ASSEMBLYDismounting the Loader1. Locate tractor and loader on firm level ground.2. Wit

Seite 42

ASSEMBLY1594 01/11 Assembly Section 3-10© 2011 Alamo Group Inc.ASSEMBLYMounting LoaderMounting is basically reverse of dismounting.To avoid injury d

Seite 43

Operation Section 4-1OPERATION SECTION

Seite 44

OPERATION1594 01/11 Operation Section 4-2© 2011 Alamo Group Inc.OPERATIONRHINO 1594 LOADEROPERATION INSTRUCTIONSYour 1594 Loader should now be assem

Seite 45 - OPERATION SECTION

OPERATION1594 01/11 Operation Section 4-3© 2011 Alamo Group Inc.OPERATION1. Standard Equipment and Specifications• Model 1594 Loaders are compatible

Seite 46 - OPERATION

OPERATION1594 01/11 Operation Section 4-4© 2011 Alamo Group Inc.OPERATION2. Operator RequirementsDO NOT use drugs or alcohol immediately before or w

Seite 47

OPERATION1594 01/11 Operation Section 4-5© 2011 Alamo Group Inc.OPERATIONAlways read carefully and comply fully with the manufacturer’sinstructions

Seite 48

Safety Section 1-1SAFETY SECTION

Seite 49

OPERATION1594 01/11 Operation Section 4-6© 2011 Alamo Group Inc.OPERATIONRepeated or substantial breathing of hazardous dusts, includingcrystalline

Seite 50

OPERATION1594 01/11 Operation Section 4-7© 2011 Alamo Group Inc.OPERATION3. Tractor RequirementsTractor Requirements and Capabilities• ASABE approve

Seite 51

OPERATION1594 01/11 Operation Section 4-8© 2011 Alamo Group Inc.OPERATION3.3 Tractor BallastBefore operating tractor and loader, add sufficient coun

Seite 52

OPERATION1594 01/11 Operation Section 4-9© 2011 Alamo Group Inc.OPERATION4. Getting On and Off the Tractor4.1 Boarding the Tractor3.4 Tractor Ballas

Seite 53

OPERATION1594 01/11 Operation Section 4-10© 2011 Alamo Group Inc.OPERATION4.2 Dismounting the TractorNever allow children or other persons to ride o

Seite 54

OPERATION1594 01/11 Operation Section 4-11© 2011 Alamo Group Inc.OPERATION5. Starting the TractorNever run the Tractor engine in a closed building o

Seite 55

OPERATION1594 01/11 Operation Section 4-12© 2011 Alamo Group Inc.OPERATION6. Pre-Operation Inspection and ServicePeriodically inspect all moving par

Seite 56

OPERATION1594 01/11 Operation Section 4-13© 2011 Alamo Group Inc.OPERATION6.2 Loader Pre-Operation Inspection and ServiceBefore operation, a complet

Seite 57

OPERATION1594 01/11 Operation Section 4-14© 2011 Alamo Group Inc.OPERATIONThe operator’s manual and safety signs affixed onthe unit contain importan

Seite 58

OPERATION1594 01/11 Operation Section 4-15© 2011 Alamo Group Inc.OPERATIONHYDRAULIC LINE INSPECTION• Check for hydraulic leaks along hoses,cylinders

Seite 59

SAFETY1594 01/11 Safety Section 1-2© 2011 Alamo Group Inc.SAFETYGeneral Safety Instructions and PracticesA careful operator is the best operator. Sa

Seite 60

OPERATION1594 01/11 Operation Section 4-16© 2011 Alamo Group Inc.OPERATIONTractor PRE-OPERATION InspectionTractor ID#______________________ Make____

Seite 61

OPERATION1594 01/11 Operation Section 4-17© 2011 Alamo Group Inc.OPERATIONFRONT END LOADER PRE-OPERATION InspectionFront End Loader ID#_____________

Seite 62

OPERATION1594 01/11 Operation Section 4-18© 2011 Alamo Group Inc.OPERATION7. Driving the Tractor and LoaderThis Implement may be wider than the Trac

Seite 63

OPERATION1594 01/11 Operation Section 4-19© 2011 Alamo Group Inc.OPERATIONSafe tractor transport requires the operator possess a thorough knowledge

Seite 64

OPERATION1594 01/11 Operation Section 4-20© 2011 Alamo Group Inc.OPERATION7.3 Driving the Tractor and Loader7.4 Operating the Tractor and LoaderDo n

Seite 65

OPERATION1594 01/11 Operation Section 4-21© 2011 Alamo Group Inc.OPERATIONThe Boom is designed only to position and operate the Bucket which is atta

Seite 66

OPERATION1594 01/11 Operation Section 4-22© 2011 Alamo Group Inc.OPERATIONCarry the loader and attachment low when transporting to reduce thepotenti

Seite 67

OPERATION1594 01/11 Operation Section 4-23© 2011 Alamo Group Inc.OPERATIONDo not operate the loader from the ground. Operate the tractor and loader

Seite 68

OPERATION1594 01/11 Operation Section 4-24© 2011 Alamo Group Inc.OPERATIONOperate the tractor and loader only in conditions where you have clear vis

Seite 69

OPERATION1594 01/11 Operation Section 4-25© 2011 Alamo Group Inc.OPERATIONAlways have a heavy attachment, such as a bucket mounted on loader when it

Seite 70

SAFETY1594 01/11 Safety Section 1-3© 2011 Alamo Group Inc.SAFETYNever allow children to operate, ride on, or come close to the Tractor orImplement.

Seite 71

OPERATION1594 01/11 Operation Section 4-26© 2011 Alamo Group Inc.OPERATIONEase lever back toward you to lift and roll backbucket.Lift and roll back

Seite 72

OPERATION1594 01/11 Operation Section 4-27© 2011 Alamo Group Inc.OPERATIONLIFTING THE LOADWhen lifting the load, keep the bucket positionedto avoid

Seite 73

OPERATION1594 01/11 Operation Section 4-28© 2011 Alamo Group Inc.OPERATIONUse extreme care when operating loader on aslope, keep bucket as low as po

Seite 74

OPERATION1594 01/11 Operation Section 4-29© 2011 Alamo Group Inc.OPERATIONLOWERING THE BUCKETAfter bucket is dumped, back away from vehiclewhile low

Seite 75

OPERATION1594 01/11 Operation Section 4-30© 2011 Alamo Group Inc.OPERATIONLOADING FROM A BANKChoose a forward gear that provides sufficientground sp

Seite 76

OPERATION1594 01/11 Operation Section 4-31© 2011 Alamo Group Inc.OPERATIONAnother method for large dirt piles is to build aramp approach to the pile

Seite 77

OPERATION1594 01/11 Operation Section 4-32© 2011 Alamo Group Inc.OPERATIONPEELING AND SCRAPINGUse a slight bucket angle, travel forward andhold lift

Seite 78

OPERATION1594 01/11 Operation Section 4-33© 2011 Alamo Group Inc.OPERATIONLOADING LOW TRUCKS OR SPREADERS FROM A PILEFor faster loading, minimize an

Seite 79

OPERATION1594 01/11 Operation Section 4-34© 2011 Alamo Group Inc.OPERATIONBACKFILLINGPoor methods actually move no more dirt andmake it more difficu

Seite 80

OPERATION1594 01/11 Operation Section 4-35© 2011 Alamo Group Inc.OPERATIONLeave dirt in bucket. Dumping on each passwastes time.Operate tractor at r

Seite 81

SAFETY1594 01/11 Safety Section 1-4© 2011 Alamo Group Inc.SAFETYOperator Safety Instructions and PracticesNever operate the Tractor or Implement unt

Seite 82

OPERATION1594 01/11 Operation Section 4-36© 2011 Alamo Group Inc.OPERATIONLeave dirt which drifts over side of bucket forfinal cleanup.Pile dirt on

Seite 83

OPERATION1594 01/11 Operation Section 4-37© 2011 Alamo Group Inc.OPERATION7.6 Operating Bale Spear Operate the bale spear using extreme caution. Sha

Seite 84

OPERATION1594 01/11 Operation Section 4-38© 2011 Alamo Group Inc.OPERATIONCarry bales as low to the ground as possible toallow maximum visibility an

Seite 85

OPERATION1594 01/11 Operation Section 4-39© 2011 Alamo Group Inc.OPERATIONThe tractor is equipped with a valve lockmechanism located between the ope

Seite 86

OPERATION1594 01/11 Operation Section 4-40© 2011 Alamo Group Inc.OPERATION9. Transporting the Tractor and ImplementNever allow children or other per

Seite 87

OPERATION1594 01/11 Operation Section 4-41© 2011 Alamo Group Inc.OPERATIONLower the loader to the bed of the truck or trailer when transporting thet

Seite 88

OPERATION1594 01/11 Operation Section 4-42© 2011 Alamo Group Inc.OPERATION9.1 Transporting on Public RoadwaysMake certain that the “Slow Moving Vehi

Seite 89 - MAINTENANCE SECTION

OPERATION1594 01/11 Operation Section 4-43© 2011 Alamo Group Inc.OPERATION9.2 Hauling the Tractor and ImplementBefore transporting a loaded tractor

Seite 90

OPERATION1594 01/11 Operation Section 4-44© 2011 Alamo Group Inc.OPERATION10. Troubleshooting GuideTROUBLE POSSIBLE CAUSE POSSIBLE REMEDYLoader slow

Seite 91 - MAINTENANCE

Maintenance Section 5-1MAINTENANCE SECTION

Seite 92

SAFETY1594 01/11 Safety Section 1-5© 2011 Alamo Group Inc.SAFETYProlonged operation may cause operator boredom and fatigue affecting safe operation.

Seite 93

MAINTENANCE1594 01/11 Maintenance Section 5-2© 2011 Alamo Group Inc.MAINTENANCE READ, UNDERSTAND, and FOLLOW the following Safety Messages. Ser

Seite 94

MAINTENANCE1594 01/11 Maintenance Section 5-3© 2011 Alamo Group Inc.MAINTENANCENEVER perform maintenance beneath a raised loader unless loader is pr

Seite 95

MAINTENANCE1594 01/11 Maintenance Section 5-4© 2011 Alamo Group Inc.MAINTENANCELubrication ScheduleBefore operating your Loader, take the time to in

Seite 96

MAINTENANCE1594 01/11 Maintenance Section 5-5© 2011 Alamo Group Inc.MAINTENANCEDaily MaintenanceRegular maintenance of your loader and hydraulic sys

Seite 97

MAINTENANCE1594 01/11 Maintenance Section 5-6© 2011 Alamo Group Inc.MAINTENANCEStorageNOTE: When loader hydraulics are disconnected from tractor, th

Seite 98

MAINTENANCE1594 01/11 Maintenance Section 5-7© 2011 Alamo Group Inc.MAINTENANCE3. Do not remove attachment from stored loader.4. Do not allow childr

Seite 99

MAINTENANCE1594 01/11 Maintenance Section 5-8© 2011 Alamo Group Inc.MAINTENANCEProper Torque for FastenersThe chart lists the correct tightening tor

Seite 100 - Email: [email protected]

MAINTENANCE1594 01/11 Maintenance Section 5-9© 2011 Alamo Group Inc.MAINTENANCE

Seite 101

MAINTENANCE1594 01/11 Maintenance Section 5-10© 2011 Alamo Group Inc.MAINTENANCE

Kommentare zu diesen Handbüchern

Keine Kommentare